Hi
lti HIT-RE 500-SD mortar
w/
 
rebar (as post-installed
conn.
)
 
 
 
Thes
e pages
are part of the Anchor
Fas
tening
Technology Manual
is
s
ue September 2014
    
    
  09 /
2014
 
898
5.Insert rebar
 
 
 
 
 
 
 
For easy installation insert the rebar
slowly twisted into the
boreholeuntil
the embedment
mark is
at the concrete surface
lev
el.
 
 
 
 
 
Ov
erhead application:
 
During insertion of the
rebar,
mortar might flow out of the borehole.
 
For collection of the flowing mortar, HIT-OHC may
be
used.
 
 
Support t
he rebar
and secure it from falling
till
mortar started to
harden, e.
g.
 
using wedges HIT-OHW.
 
 
 
 
 
After installing the rebar
the annular
gap must be c
ompletely
filled
with mortar.
 
 
 
 
 
After installing the rebar
the annular
gap must be c
ompletely
filled
with mortar.
 
Proper
installation c
an be verified
when:
Desired anchoring embedment is
reached
A
v
: embedment
mark at
conc
rete surface.
 
Excess
mortar flows out of the borehole
after the rebar has been fully
inserted until the embedment mark.
 
 
 
 
 
 
Full load may be applied
only after
the curing
time “t
cure
” has elapsed.