Injection System Hilti HIT-CT 1 for rebar connection
 
 
 
Rebar preparation and foil pack preparation
 
 
Before use, make sure the rebar is dry and free of oil or
other residue.  
Mark the embedment depth on the rebar, e.
g. with tape
  
v
resp.
e,ges
 
Insert Rebar in borehole to verify hole and setting depth
v
resp.
e,ges
 
 
Insert foil pack into the foil pack holder.
 
Observe the Instruction for Use of the dispenser
Check foil pack holder for proper function.
 
Put foil pack into foil pack holder.
 
Do not use damaged foil packs / holders.
 
 
Static Mixer HIT-RE-M
 
 
Hilti HIT-CT 1 (foil pack 330ml and 500ml)
 
Check Expiration date
Foil pack temperature:  
+5°C
 
to  +40°C  
Base material temperature:   -5°C
to  +40°C
 
 
 
Manual dispenser:  
HIT-MD 2000 / HIT-HDM 330 (330ml)  
HIT-MD 2500 / HIT-HDM 500 (330/500ml)
 
 
or  Electric dispenser:  
HIT-ED 3500 (330/500ml)
HIT-ED 3500-A (330/500ml)
HIT-HDE 500 (330/500ml)
 
 
or  Pneumatic dispenser:  
HIT-P3000HY (330ml)
Hilti HIT-P3500F (330/500ml)
 
 
Tightly
attach
Hilti
mixing
nozzle
to
foil
pack
manifold.
Do not modify the mixing nozzle.
 
Insert foil pack into the foil pack holder.  
Observe
the
Instruction
for
Use
of
the
dispenser
Check
foil
pack
holder
for
proper
function.
Put
foil
pack
into
foil
pack
holder.
Do
not
use
damaged
foil
packs
/
holders.
 
Insert foil pack holder with foil pack into dispenser.
 
Push
release
trigger,
retract
plunger
and
insert
foil
pack
holder with foil pack into the appropriate Hilti dispenser.
 
 
330ml  2 trigger pulls
 
500ml  3 trigger pulls
 
Discard initial mortar.  
The
foil
pack
opens
automatically
as
dispensing
is
initiated.
Depending on the size
of the foil pack an initial
amount of mortar has to be discarded.
 
After
changing a
mixing nozzle, the first
few trigger
pulls
must be discarded as described above. For each new foil
pack a new mixing nozzle must be used.
 
 
Annex 12
 
Installation instruction IV
Rebar preparation and foil pack preparation